174_iowa_model_steam_engineers
In 2003 the club moved to its current track site in rural Mount Pleasant on the Tom Morgan acreage. The first phase was 900 feet of 7 ½” track in an oval with a 120’ curved trestle, 90’ curved tunnel, 20’ panel bridge, and switches for a Y. Next the highline track was purchased from the St Croix live steamers and 650’ installed with a switch to move off the main to a turn table and steaming bays. The ground track yard improved and steaming bays installed. In the spring of 2008 a 900’ extension was started, and completed in the spring of 2010.This extension was a figure eight with a trestle to create and over and under.
Related
No Records Found
Sorry, no records were found. Please adjust your search criteria and try again.
Google Map Not Loaded
Sorry, unable to load Google Maps API.
-